Witney Level 2 SFRA
A District Council with a local development plan in Oxfordshire. A proposed 1,000-house development needs a flood risk assessment to confirm it will meet sustainability criteria.
The Witney area has been subject to flooding from the River Windrush and from …



Much of the East West railway project, with significant engineering including embankments, new bridges and tunnels, is located in flood prone areas of the River Thames floodplain. It is crucial that the development doesn’t increase flood risk.
The longest new domestic railway to be constructed in Britain for over 100 years runs partly through the River Tweed Special Area of Conservation (SAC). Scottish Natural Heritage (SNH) requires an Appropriate Assessment for this part of the route.
A 132kV powerline tower needs to be replaced and relocated with new infrastructure in Neath. This must be done without contaminating the nearby waterbody, the Cefn Cwrt Reservoir, or changing its inflow volumes.
2012: the government launches its second tender process for a carbon capture and storage (CCS) demonstration project in the UK. The White Rose project at the coal-fired Drax power station in North Yorkshire, and a gas-fired Shell power station in …